Our services

Four areas of renovation.One contractor.

Turn-key renovations of flats, bathrooms and bathroom cores. One team coordinates everything — from demolition to handing over the keys.

0days
average for a complete bathroom-core renovation
0%
off materials at SIKO and other partners
0+
completed projects across Bratislava & Trnava regions
01Flat renovation

Complete flat transformation

From demolition to final paint. One contractor for the whole project — no contractor juggling, no surprise invoices.

What you get
No contractor juggling
One team from demolition to handover
Indicative price from €3,500
What's included
Demolition and waste removal
Masonry and plastering
Electrical installation
Plumbing and heating
Flooring — parquet, laminate, tiles
Drywall, ceilings, suspended ceilings
Painting and finishing
Final clean before handover
02Bathroom renovation

A bathroom you won't want to leave

Complete renovation from demolition to the last grout line. With up to −20 % off materials at SIKO and Keramika Soukup partners.

What you get
Tiles, sanitary and LED in one go
Done in 5–10 working days
−20% off materials
What's included
Demolition and waste removal
Waterproofing and substrate prep
Plumbing and drainage
Tiles, floor tiles, microcement
Sanitary ware, taps, shower enclosures
LED lighting and backlit mirrors
Ventilation and heated towel rails
Final clean before handover
03Bathroom core

Bathroom core in five days

Fast, clean transformation of your old bathroom core. The date is agreed in advance — we keep it. Our signature guarantees it.

What you get
Deadline guaranteed in writing
Full bathroom core in 5 working days
Indicative price from €1,800
What's included
Demolition of existing core
New waste and supply pipes
Bathroom electrical works
Tiles and floor tiles
Sanitary ware, tap, shower / bath
Ventilation and lighting
04Electrical works

Safe wiring with inspection report

Electrical modernisation during a renovation or as a standalone job. Inspection report included — no extra charge.

What you get
Inspection report included, no extra
Certified electricians
Inspection valid for 10 years
What's included
Inspection of existing wiring
New electrical circuits
New fuse box and distribution board
Sockets, switches, data outlets
Lighting and LED strips
Inspection report included
Why BYTGroup

One team.
Zero stress.

Four trades under one roof — electrician, plumber, tiler, painter. You deal with one person.

FAQ

Got questions?
We have answers.

Didn't find the answer? Call us or book a free survey.

How long does a flat renovation take?
A standard 2-room flat renovation takes 14–21 working days. A bathroom takes 5–10 days, a bathroom core 5 days. The exact schedule is confirmed after the survey.
What's included in the price?
Labour, waste removal, and coordination of all trades. Materials aren't included in the base price, but our partner discounts save you up to −20% vs. retail.
Can I live in the flat during renovation?
For full renovations we recommend moving out temporarily. For partial work — bathroom or electrics — staying on-site with minimal disruption is possible.
Do you guarantee the deadline?
Yes. The deadline is part of the contract. If we miss it through our own fault, we deduct from the final invoice.
Do you work outside Bratislava?
We cover the Bratislava and Trnava regions. For projects outside this area, contact us — for larger scope we can discuss individually.

Let's start with a free survey.

Our specialist visits, inspects the space, listens. Takes 30–60 minutes. We reply within 24 hours.

or call us: 0918 269 979
Free survey